Depot construction nearing completion tensive work ful to citizens

Edgar's picture
Article Image Alt Text

Kevin Gosey, painting contractor, puts the finishing touches on a door at the Many Depot. It will be known as Many’s Sabine Parish Museum when it opens.

The renovation and restoration of the historic Many Depot is nearing completion after more than 10 months of work on the brick building, which is listed on the National Registry of Historic Places.

Painting contractor Kevin Gosey of Many began putting the finishing touches on the painting of all exterior and interior surfaces last week. People who drive by the depot can now see the freshly painted Hunter Green doors with white trim. The concrete benches in the portico section are painted a spring green. Painting on the interior included walls, ceilings, ceiling beams, and all wood surfaces.

Rotted wood on both the interior and exterior of the building, broken windows, exterior and interior doors, ceilings, and walls were all repaired, rebuilt, or newly constructed by Kowonno Green Handyman Services.

 

 

To read more please log in or subscribe to the digital edition http://www.etypeservices.com/Sabine%20IndexID378/

Rate this article: 
No votes yet